Signal Post House
Ready to Start Blockwork
Jan 22, 2018
POST
Slab dried and the first row of blocks laid.
Previous Article
Frosty Site
Dec 28, 2017
POST
Next Article
Half Way Through Ground Floor
Jan 22, 2018
POST